Search results for "process waste"

showing 3 items of 3 documents

OPTIMIZATION OF GREEN-BUILDING DESIGN PROCESSES - CASE STUDY

2016

The development of a green-building project following a specific reference standard such as LEED, brings new conditions and restrains for all subjects involved in the process. Such changes affect technicians, owners, bureaucracy and also the management tasks either during design or construction phases.  Within this scope, project management plays a key role for the optimization of the design-project development. This research analyzes the design process of a single case-study project from the project management perspective, taking into consideration all the activities that negatively affected the project design development. The project selected for the scope of the research is a new school …

EngineeringWork breakdown structureNA1-9428green-buildingCertificação LEEDProject charterArchitectureLEANProject managementExtreme project managementProject management triangleOPM3business.industryprocess wasteGreen-buildingleansustainabilityEngineering (General). Civil engineering (General)project managementdesign processEngineering managementProject planningSystems engineeringTA1-2040businessoptimizationSoftware project managementMIX Sustentável
researchProduct

Insights on mechanisms of excess sludge minimization in an oxic-settling-anaerobic process under different operating conditions and plant configurati…

2022

In the present research, insights about the mechanisms of excess sludge minimization occurring in an oxic-settling-anaerobic (OSA) were provided. The investigation involved two systems operating in parallel. In particular, a conventional activated sludge (CAS) system as control and a system implementing the OSA process both having a pre-denitrification scheme were considered. Five periods (P1-P5) were studied, during which several operating conditions and configurations were tested. Specifically, the hydraulic retention time (HRT) in the anaerobic reactor of the OSA system (P1 8 h, P2-P3 12 h, P4 8 h, P5 12 h) and the return sludge from the anaerobic to the anoxic (scheme A) (P1-P2) or aero…

Environmental EngineeringSettore ICAR/03 - Ingegneria Sanitaria-AmbientaleSewageExtracellular Polymeric Substance MatrixHealth Toxicology and MutagenesisPublic Health Environmental and Occupational HealthGeneral MedicineGeneral ChemistryActivated sludge Anaerobic side-stream reactor Biological nutrients removal Excess sludge minimization Oxic-settling-anaerobic (OSA) process Wastewater treatmentWaste Disposal FluidPollutionBioreactorsEnvironmental ChemistryAnaerobiosisChemosphere
researchProduct

THE INTEGRATION OF GREEN-BUILDING TASKS AND PROJECT-DESIGN PROCESSO - CASE STUDY

2018

The development of a green-building project following a specific reference standard such as LEED, brings new conditions and restrains for all subjects involved in the process. Such changes affect technicians, owners, bureaucracy and also the management tasks either during design or construction phases.  Within this scope, the management of sustainabilityrelated activities plays a key role for the optimization of the design-project development. This research analyzes the design process of two different case-study projects undergoing the same green-building certification from the project management perspective. In both project sustainability-related activities were performed throughout the de…

Process managementProcess (engineering)Computer sciencemedia_common.quotation_subjectCertificationNA1-9428green-buildingintegrated processLEEDArchitectureLEANProject managementmedia_commonScope (project management)business.industryleedprocess wasteGreen-buildingSchedule (project management)Ciências Sociais Aplicadas (Arquitetura e UrbanismoleanEngineering (General). Civil engineering (General)project managementSustainabilityBureaucracyDesign)TA1-2040businessEngineering design processMix Sustentável
researchProduct